Successful testing of 2.2m prototype

by

Fistuca is pleased to announce having finished a series of successful near-shore piling tests with a 2.2m prototype. Two piles have been driven, a Ø2.2 meter open-ended pile and a Ø0.7 meter closed-ended pile. Extensive measurements of underwater sound levels and pile driving properties have been performed. We would like to thank Van Oord Offshore Wind Projects and TNO for their collaboration. More in-depth information on these tests will be presented at the EWEA Offshore in Frankfurt in November 2013.